Does my air-conditioning system need a TM44 inspection?

Equipment and work · Question 1 of 3

What air-conditioning equipment is controlled as part of the building system?

Count the combined effective rated output of systems under the same control. Several smaller units can together exceed 12 kW.

What air-conditioning equipment is controlled as part of the building system?

Choose an industry and at least one equipment or work type.

More help with TM44 inspections

Use these when you need more detail before appointing someone. This questionnaire is decision support, not a professional assessment or a legal determination.

Guides, technical explanations and references

Duty and technical sources

In England and Wales, air-conditioning systems with a combined effective rated output above 12 kW must be inspected by an accredited energy assessor at intervals not exceeding five years.

Published price evidence

  • AccuTemp — Publishes a fixed price from £450 plus VAT and a stated range of £450 to £1,800 plus VAT for most single-site work.
  • Robinsons Facilities Services — Publishes smaller split-system inspections from £300 plus VAT and larger or central-plant work typically from £400 to £1,000 plus VAT.
  • Heat Pump Installers London — Publishes TM44 inspections from £245 plus VAT for London and the Home Counties.
Inspection sequence

System boundaries turn units into one inspection duty

The assessor groups equipment under common control, verifies effective rated output and examines the energy performance of the complete air-conditioning system.

Check against GOV.UK inspection guide
  1. 01Plant inventoryIndoor units, outdoor units, chillers, AHUs and rated outputs
  2. 02Control boundaryThe person, building and units managed as one system
  3. 0312 kW thresholdCombined effective rated output, not only one unit rating
  4. 04InspectionAccessible plant, controls, sizing, records and operation
  5. 05Lodged reportFindings, recommendations, limitations and next due date
Evidence a competent appointment should leave visible
  • Plant and system schedule
  • Capacity and grouping rationale
  • Accredited assessor details
  • Lodged report and recommendations