Buy a DSEAR assessment on comparable terms
Use one brief, ask every provider the same competence questions and compare what is actually included—not just the fee.
A comparable quote must answer five things
- Who will do the work and why are they competent for these hazards?
- Which sites, processes, substances and documents are in scope?
- What site work, analysis, classification and drawings are included?
- What report, action plan and follow-up will be delivered?
- What is excluded, assumed or separately chargeable?
Information to assemble before requesting quotes
Mark unknown items explicitly. A supplier can price discovery work; it cannot price an assumption you have not disclosed.
- Site address, number of buildings and approximate operational floor area
- Short description of each process, including cleaning, maintenance and foreseeable abnormal work
- Dangerous-substance inventory with quantities, locations and current safety data sheets
- Site and process layouts, PFDs or P&IDs where available
- Ventilation, extraction, gas detection and isolation information
- Existing DSEAR, COSHH, fire, HAZOP or related assessments
- Existing hazardous-area drawings and Ex-equipment registers
- Incident, near-miss, enforcement, insurer or planned-change context
- Required timescale, operational access limits and shutdown constraints
Project brief
Business and site: ______________________________________________
Reason for commissioning: first assessment / change / new installation / review
Substances and hazards: ________________________________________
Processes and release points: ____________________________________
Known or possible zoning need: ___________________________________
Documents available: ___________________________________________
Sites and areas in scope: ________________________________________
Target visit and report date: _____________________________________
Required quotation format
- Named assessor and proposed supporting team
- Scope and method, including site attendance and document review
- Deliverables, file formats and draft/final review process
- HAC schedules, calculations and drawings included or clearly excluded
- Assumptions, buyer dependencies and exclusions
- Fixed fee or day-rate basis, VAT, travel and additional-work rates
- Proposed dates and validity period
Competence and evidence questions
DSEAR does not prescribe one universal assessor certificate. Test competence against the actual work you are buying.
- Who is the named assessor, and what relevant training, qualifications and current professional standing can you evidence?
- Which recent projects involved comparable substances, release conditions and process complexity?
- Who will undertake hazardous area classification and produce calculations or drawings if it is required?
- Which standards and industry guidance do you expect to use, and where might a specialist test or separate discipline be needed?
- Can you provide current professional indemnity and public liability evidence appropriate to the project?
- How do you quality-review reports and deal with disputed assumptions or factual corrections?
- Will you declare subcontractors, conflicts, referral arrangements or product-sales interests?
Comparable quote scorecard
| Comparison point | Provider A | Provider B | Provider C |
|---|---|---|---|
| Named assessor and relevant competence | |||
| Similar hazard/process evidence | |||
| Site work included | |||
| Substance inventory and release review | |||
| HAC schedules/calculations | |||
| HAC drawings | |||
| Electrical/non-electrical equipment review | |||
| Prioritised action plan | |||
| Draft review and debrief | |||
| Travel, VAT and expenses | |||
| Exclusions and additional rates | |||
| Delivery date | |||
| Total comparable fee |
Do not add the scores blindly. A missing competence or scope requirement can be a stop condition, not a small numerical disadvantage.
Report acceptance check
- Correct sites, processes, substances, quantities and operating conditions
- Evidence sources and material assumptions are visible
- Normal work, cleaning, maintenance and credible abnormal events are considered
- Release scenarios, ventilation and ignition sources are connected to conclusions
- Hazardous-area classification is included where needed and absent only for an explained reason
- Drawings and schedules agree with the written report
- Existing controls and gaps are distinguished
- Actions are specific, prioritised and assigned sensible timescales
- Unresolved tests, data gaps and specialist dependencies are explicit
- Draft factual corrections and final debrief have been completed
Review triggers after appointment
Keep the assessment connected to operational change. Regulation 5 requires review where there is reason to suspect the assessment is no longer valid or where there has been a significant change.
- New substance, supplier formulation or materially different quantity
- New plant, process, layout, ventilation or extraction arrangement
- Changed release point, operating temperature, pressure or transfer method
- Modified electrical or mechanical equipment in or near a hazardous area
- Fire, explosion, loss of containment, near miss or control failure
- Evidence that an assumption, drawing or safety-data basis is no longer current
Primary basis: DSEAR 2002, Regulation 5 and HSE L138 .